1

Pick the right role when you register.

If you log in to Essential Connections as an ASP/EC, choose ‘Installer’ in the NSW CER Installer Portal. If you log in to Essential Connections as a solar retailer/customer/developer and do both roles, choose ‘Installer/Applicant’.

2

Wait until you have a job before registering as an applicant.

You can only register as an applicant once your connection application has created a job in the NSW CER Installer Portal. Jobs will be created for Essential Energy embedded generation connection applications submitted from 23 November 2026.

3

Names must be exact.

NSW CER Installer Portal names are case-sensitive: enter your company name as it appears in the Australian Business Register and your installer name as it is shown on your electrical contractor’s licence.

4

Check devices are supported before you quote.

Check the equipment you are using is on Essential Energy’s list of supported devices for backstop and flexible exports. These are CSIP-AUS v1.2 compliant and onboarded by Essential Energy. Some devices may not be supported yet and your capability test will fail.

5

Have your job details handy.

The DNSP application ID is the ECN from your approved Essential Connections application. In the NSW CER Installer Portal, select ‘Installations’ → ‘Claim installation’ and search with the ECN and the site NMI. Tab out of the NMI field before you hit Search, as the button stays greyed out until you do.

6

Update devices before hitting ‘Start’.

Equipment changed? Submit a ‘Pre-installation Device Update’ in Essential Connections and wait for the outcome before selecting ‘Start installation’ in the NSW CER Installer Portal. The Intent to Connect is no longer needed.

7

Get firmware updates going early.

Before starting in the CER Installer Portal, make sure the latest firmware update has finished. Even after you install the pending update, another one may follow and some updates can stop communications for up to an hour.

8

Manufacturer’s app first.

Connect the inverter or communications client to the customer’s internet using Ethernet, Wi-Fi or a hotspot. In the manufacturer’s app, check Region A / Australia A, the site NMI and inverter registration, with Essential Energy selected as the distributor.

9

Site loads impact tests.

Make sure the system is exporting before starting the capability test in the NSW CER Installer Portal. Site loads and battery activity can affect test results. Set the inverter’s export limit to the approved maximum first, as a 0kW limit makes the export test impossible. On a battery site, start the test in the afternoon once the battery is full and the system is sending power to the grid. The 1.5 kW default limit can take about a minute to kick in, so give it time before you abort.

10

Low export doesn’t have to stop you.

If the export limit test fails because export is too low, use the NSW CER Installer Portal’s alternative generation limit test, which the portal only offers once the export test has failed. It needs more than 1 kW of generation, which a battery site soaking up all its solar may not reach. Not enough sun for either test? You can run the test remotely later.

11

Use Installer Portal only for CCEW.

You generate the Certificate of Compliance for Electrical Work (CCEW) in the NSW CER Installer Portal – you don’t need to submit it in the eCert Portal as well.

Related Articles

Written on November 18, 2026

2026 SEIA Annual Solar Installer Conference book now Event dates The SEIA Annual Solar Installers’ Meetings are happening again Your ticket unlocks an action-packed, single-day

Written on November 25, 2025

2026 SEIA Annual Solar Installer Conference book now Event dates The SEIA Annual Solar Installers’ Meetings are happening again Your ticket unlocks an action-packed, single-day

Written on October 30, 2025

We are coming to the regions! book now Event dates Join us for a fast-paced roadshow across NSW Future changes to the Grid connection, Lithium